MicrogridMedia

Meyer Burger’s German Subsidiaries File for Insolvency

Jonas Muthoni

Published · 2 min read

Industrial robots assembling solar panels - CS PowerTech

Meyer Burger Technology AG, a Swiss solar panel manufacturer, has filed for insolvency for its two German subsidiaries: Meyer Burger (Industries) GmbH and Meyer Burger (Germany) GmbH. This decision follows ongoing financial challenges and unsuccessful restructuring efforts.

Details of the Insolvency

The insolvency proceedings affect two key facilities in Germany:

  • Thalheim (Bitterfeld-Wolfen): Solar cell production site employing 331 people.
  • Hohenstein-Ernstthal: Mechanical engineering and technology development site with 289 employees.

Despite intensive efforts to keep these sites operational, the company was unable to secure the necessary financial stability. A provisional insolvency administrator will be appointed by the court to oversee the proceedings.

Impact on Employees

Approximately 620 employees in Germany are affected by the insolvency filings. The company has stated that it will work closely with the appointed administrator to ensure fair treatment of all employees during this process.

Operations in Other Regions

While the German subsidiaries are undergoing insolvency proceedings, other parts of Meyer Burger’s operations remain active:

  • Switzerland: Meyer Burger (Switzerland) AG, based in Thun, continues to operate with around 60 employees.
  • United States: Meyer Burger (Americas) Ltd. remains in existence, although its solar module production facility in Goodyear, Arizona, was recently shut down, resulting in the layoff of 282 employees.

Reasons Behind the Financial Challenges

Meyer Burger has faced several challenges leading to the current situation:

  • Market Competition: Intense competition from lower-cost manufacturers, particularly from Asia, has put pressure on prices and margins.
  • Financial Constraints: The company has struggled with liquidity issues, making it difficult to sustain operations and invest in necessary upgrades.
  • Project Cancellations: The termination of significant agreements, such as the one with D.E. Shaw Renewable Investments (DESRI), impacted projected revenues and growth plans.

Future Outlook

Meyer Burger is currently in discussions with creditors to explore restructuring options. The company has also requested an extension for submitting its 2024 financial results, with the current deadline having expired on May 31, 2025.

About Meyer Burger

Meyer Burger Technology AG is known for its high-quality solar technology, focusing on heterojunction solar cell technology (HJT) and modules. The company aims to bring back European manufacturing excellence and reduce dependency on non-European suppliers. Its technologies are designed to deliver superior efficiency, performance, and sustainability.

Summary Table

LocationFacilityEmployees AffectedStatus
Thalheim, GermanySolar Cell Production331Insolvency Proceedings
Hohenstein-Ernstthal, GermanyEngineering & Development289Insolvency Proceedings
Thun, SwitzerlandHeadquarters60Operational
Goodyear, Arizona, USAModule Production282Shut Down
Jonas Muthoni

Jonas Muthoni

Jonas Muthoni is Editor-in-Chief of Microgrid Media, where he oversees reporting and analysis on microgrids, energy storage, distributed energy resources, data center power demand, grid modernization, resilience, renewable energy, and electricity policy and markets. His work focuses on the infrastructure, technologies, and regulatory developments reshaping the power system. As Editor-in-Chief, Jonas leads Microgrid Media’s editorial strategy and standards, including story selection, source verification, technical accuracy, and the development of original reporting and analysis. His coverage draws on regulatory filings, government records, utility and company disclosures, technical documentation, and independent industry sources to explain significant developments across the evolving energy system.